TECH 2: CONSULTANT’S ORGANIZATION AND EXPERIENCE |
A – Consultant’s Organization
2.1 Introduction
KUNHWA CONSULTING & ENGINEERING CO., LTD. (hereafter referred as KUNHWA) is associated with Dasan Consultants Co., Ltd. (hereafter referred as DASAN) to provide the Consulting Services for Transport Connections in Northern Mountainous Provinces Project (Loan No. 2789 – VIE)
2.1.1 Kunhwa Consulting & Engineering Co., Ltd.
Founded in 1990, Kunhwa Consulting & Engineering Co., Ltd. has grown into a leading consulting and engineering firm in Korea and International Market. We draw upon the experience, skills and versatility of our staff to understand our customers’ challenges, anticipate their future needs, and provide innovative solutions. This has enabled KUNHWA to build a reputation for delivering high quality, on-time and on-budget performance.
KUNHWA offers professional services in several major field of civil, road and highway engineering/transportation, environmental engineering; water resource development, urban planning and regional development; tunnel and underground space, railroad and subway, harbor/port; mechanical and electrical plant, construction management and supervision. Our permanent staffs are currently 1,210 consisting of 680 design engineers, 450 construction supervision engineers, 80 research &development, contracting and administration staffs.
Kunhwa has already carried out more than 3,620 projects involving feasibility study, bidding preparation, engineering design and construction supervision for government organizations and private sector clients during last 20 years at home and abroad with a total worth of over US$1,200 million.
KUNHWA has set up a local representation office, the 100% owned local company (Kunhwa Co., Ltd.) with capital of US$1 million in Ho Chi Minh City, in August 2007. Kunhwa is recently awarded the Construction Supervision services for the Section of Thu Bay-Kenh 14 Bridge of GMS Vietnam Southern Coastal Corridor Project, executed by My Thuan PMU.
Additionally, Kunhwa is implementing Consulting and Engineering Service of Civil Infrastructure including Urban Road & Bridge for Nha Be New Town (340ha) in Vietnam and Detailed Engineering Design, Construction Supervision and Post Construction Supervision for the Construction of Bacolod-Silay Airport Access Road Project, Philippine. Kunhwa also performed several access road and industrial complex design projects for Hyundai AMCO India related to the expansion of Hyundai automobile manufacturing factory in Chennai, India. Furthermore, Kunhwa’s multi-sector specialties have been successfully practiced and provided satisfactory performance in projects in Sri Lanka, Cambodia, United Arab Emirates, Libya, Mongolia and Republic of Congo.
Moreover, KUNHWA has well-organized project management and project support system defined within the framework of KUNHWA’s quality management system certified with international standard: ISO 9001 (Quality Systems Model for Quality Assurance), ISO 14001 (Environmental Management Systems) and VE (Value Engineering for Road & Railroad). Also, KUNHWA is registered in EDCF (Korea Exim Bank) and KOICA, ADB (Asian Development Bank), IBRD/IDA (World Bank), AfDB (African Development Bank), EBRD (European Bank for Reconstruction and Development) as Consultant.
2.1.2 Dasan Consultants Co., Ltd.
Since its foundation in 1993, DASAN CONSULTANTS has played a major role in the national development of Korea based on respect for humans and protection of the environment. Through continuous research and development of engineering technologies and cultivation of its human resources, DASAN has grown to be the top multi-disciplinary consulting company in Korea with “Customer Satisfaction” as its primary goal.
In 2010, DASAN’s total sales for its services amounted to USD 40,247,152 which is attributed to the hard work of its professional engineers, planners, engineering and support staff, as well as the efficient management of its top and senior executives. As of November 2011, DASAN permanent employees sum up to 467 and it is comprised of 394 of civil engineers including 68 professional engineers and 73 of supporting staffs. As shown the below, the organizational structure of DASAN is under the leadership of the Chairman. DASAN is divided into several divisions which are headed by the CEO.
DASAN has established DASAN Vietnam Co., Ltd. last May 2010 to represent the company’s long term business plans and its strong commitment to the future infrastructure development in Vietnam and its neighboring countries. Currently DASAN Consultants is implementing the detailed design and construction supervision of two (2) GMS-Southern Coastal Corridor Projects, namely the Minh Luong-Thu Bay Section Project and the Rach Gia Bypass Construction Project in Viet Nam. Both projects involve detailed design and supervision for the construction of new and existing roads for expansion.
With a vision to be the top Global Technology Service Company by 2012, DASAN continues to explore the overseas engineering market in Southeast Asia, Middle East, Africa, and other parts of the world.
B – Consultant’s Experience
Table 2-1 : Summary List of 20 Major Projects Experience
|
Sheet
No. |
Project Name |
Country |
Total Contract Amount (US$) |
Contract
Period |
|
1 |
Feasibility Study for Cambodia National Road No. 21 and Bridge No. 11 Construction Project |
Cambodia |
USD 251,490 |
Apr. 2010~
Sep. 2010 |
|
2 |
Consulting Service of Civil Infrastructure including Urban Road & Bridge for Nha Be New Town |
Vietnam |
USD 3,571,815 |
Aug. 2007~
Dec. 2010 |
|
3 |
Detailed Design for GMS-Southern Coastal Corridor Project (Rach Gia Bypass Section) |
Vietnam |
USD 3,210,882 |
Jan. 2009~
Jan. 2010 |
|
4 |
Detailed Design for GMS-Southern Coastal Corridor Project (Minh Luong – Thu Bay Section) |
Vietnam |
USD 2,004,601 |
Jan. 2009~
Sep. 2009 |
|
5 |
Consulting Service for the Detailed Engineering Design, Construction Supervision and Post Construction Supervision for the Construction of Bacolod-Silay Airport Access Road Project |
Philippines |
USD 1,022,533 |
Nov. 2010~
Oct. 2012 |
|
6 |
Detailed Design and Construction Supervision for the Jagul Mountain Beltway Construction |
Korea |
Design:
USD 472,231
C/S:
USD 2,139,114 |
Design:
Jun. 1998~
Jul. 1999
C/S:
Jun. 2000~
Mar. 2008 |
|
7 |
Detailed Design and Construction Supervision for Road Construction between Jeongub and Wanju (Section 1) |
Korea |
Design:
USD 2,450,587
C/S:
USD 2,123,061 |
Design:
Jun. 2000~
Nov. 2002
C/S:
Jan. 2003~
Jun. 2011 |
|
8 |
Detailed Design and Construction Supervision for Construction of Regional Road between Ilro and Imseong |
Korea |
Design:
USD 559,891
C/S:
USD 1,849,132 |
Design:
Jun. 2000~
Oct. 2001
C/S:
Dec. 2004~
Dec. 2011 |
|
9 |
Detailed Design for Road Improvement between Sosa and Noksan |
Korea |
USD 2,707,768 |
Jan. 2005~
Jul. 2006 |
|
10 |
Construction Supervision of Road Improvement between Deokpo and Yeonha |
Korea |
USD 5,408,491 |
Sep. 2002~
Dec. 2007 |
|
11 |
Construction Supervision for Road Expansion & Maintenance Works between Guseongpo and Doochon |
Korea |
USD 5,289,855 |
Dec. 2000~
Dec. 2007 |
|
12 |
Construction Supervision for Road Construction Along Tancheon Road between Taepyeong and Bokjeong-dong |
Korea |
USD 1,013,550 |
Mar. 2005~
Aug. 2008 |
|
13 |
Construction Supervision for Road Construction between Sojung and Baebang in Cheonan |
Korea |
USD 4,388,437 |
Aug. 2002~
Dec. 2011 |
|
14 |
Construction Supervision for Road Construction between Bukmyeon and Wondeok |
Korea |
USD 3,700,632 |
Nov. 2003~ Dec. 2009 |
|
15 |
Construction Supervision of National Road No. 98 Improvement from Unsu to Daeseong |
Korea |
USD 1,217,317 |
Nov. 2003~
Nov. 2008 |
|
16 |
Construction Supervision for Road Construction between Sengkuk and Janhowon |
Korea |
USD 2,651,309 |
Oct. 1996~
Dec. 2002 |
|
17 |
Construction Supervision for Gaya – Masan Rural Road Expansion and Pavement Project |
Korea |
USD 3,237,850 |
Jan. 1996~
Jan. 2008 |
|
18 |
Construction Supervision for Access Road Construction Project between Sabuk and Wongu |
Korea |
USD 1,753,388 |
Sep. 1999~
Sep. 2004 |
|
19 |
Construction Supervision for Rural Road Construction Project between Gijachon and Bukhansan-ro |
Korea |
USD 899,277 |
Dec. 2002~
Jul. 2005 |
|
20 |
Construction Supervision for 2002 Rural Road Expansion and Pavement Project |
Korea |
USD 719,061 |
Apr. 2003~
Jul. 2006 |
Table 2-2 : Detailed Description of 20 Major Project Contracts
Sheet No. 1
Assignment name:
Feasibility Study for Cambodia National Road No. 21 and Bridge No. 11 Construction Project |
Approx. values of the contract:
US $251,490
|
|
Country: Cambodia
Location within country: Phnom Penh City |
Duration of assignment (months):
4 months |
|
Name of Client:
Korea Exim Bank |
Total No of person-months of the assignment:
80 M/M |
|
Address:
16-1 Yeouido-dong, Yeongdeungpo-gu, Seoul, Korea |
Approx. value of the services provided by your firm under the contract:
US $ 251,490 |
|
Start date (month/year): April 2010
Completion date (month/year): September 2010 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: None |
|
Name of joint venture partner or sub-Consultants, if any:
None |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Cho, Wan Sang |
|
Narrative description of Project:
The purpose of the project is to secure traffic safety, enhance the trade, and to improve access to education, healthcare, market, etc., by building road infrastructure
· Total length: L=65.5km (2 lanes)
|
Section |
Width |
Lanes |
Length |
|
STA. 0+000~2+160 |
20.0m
(10.0m@ both direction) |
4 |
2.16km |
|
STA. 2+160~11+200 |
21.0m |
4 |
9.04km |
|
STA. 11+200~ 65+500 |
11.0m |
2 |
54.3km |
· Design Speed: 80km/hr
· Intersection: 52 locations
· Bridge: 77 locations on National Road No. 21
· Civil infrastructure
· Soft ground treatment
· Major intersection: Roundabout 2 intersections
· Pavement type: Asphalt-Concrete pavement |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Verify the scope of work and confirm rod condition inventories
· Investigate material, geotechnical investigation
· Investigate and apply characteristics of traffic volume, circumferential road system, and traffic volume at major cross sections (per hour, per direction, and per type of vehicle)
· Implement geotechnical material investigation and surveying
· Determine cross sectional areas of structures in terms of stability, economic efficiency, and construction efficiency using an authorized structural analysis program |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 2
Assignment name:
Consulting Service of Civil Infrastructure including Urban Road & Bridge for Nha Be New Town |
Approx. values of the contract:
US $3,571,815
|
|
Country: Vietnam
Location within country: Nha Be City |
Duration of assignment (months):
40 months |
|
Name of Client:
GS Engineering & Construction (Vietnam) |
Total No of person-months of the assignment:
500 M/M |
|
Address:
GS Yeokjeon Tower, 537 Namdaemun-ro, 5-ga Jongro-gu, Seoul, Korea |
Approx. value of the services provided by your firm under the contract :
US $3,571,815 |
|
Start date (month/year): August 2007
Completion date (month/year): December 2010 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: None |
|
Name of joint venture partner or sub-Consultants, if any:
None |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Nam, Jeong Woo |
|
Narrative description of Project:
The construction of civil infrastructure for Nha Be new Town was prepared for the 340ha area. The services integrated factors such as environmental friendliness, economical efficiency, constructability, and safety, according to the specifications and decree and design requirements that are determined by Ho Chi Min City and the Ministry of Construction of Vietnam.
· Earthwork: Embankment (6,150,000m3), Drainage: 51,600m
· Internal road: 28 km, B = 6~70m, Ground Improvement: A=55ha (approx.)
· Water Supply System
Designed population: 68,000
Maximum amount of water supplied per day: 29,304m3/day
· Sewer System
Designed population: 68,000
Maximum amount of sewage per day: 16,307m3/day
· Bridge: 6 locations
· Surveying and soil investigation |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
Review of master plans, current budgeting, accounting and provide financial reporting
· Prepare standard tender documents and selection of appropriate format in according with client’s guideline and legal regulation;
Coordinate with national consultants and prepare project design & monitoring framework
Design work including general survey, geometric design, road drainage design, bridge design, appurtenant works, environmental impact assessment (EIA), cultural resource investigation, noise & vibration resistance design, construction cost estimation and traffic impact assessment;
Design works & plan of construction regulations such as notice of designated field engineers and documentary evidence, progress schedule, management plans of quality, safety, harms, risk and environment; |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No.3
|
Assignment name :
Detailed Design for GMS-Southern Coastal Corridor Project (Rach Gia Bypass Section) |
Approx. value of the contract (in current US$ or Euro):
US$3,210,882 |
|
Country : Vietnam
Location within country : Kien Giang Province |
Duration of assignment (months):
12months |
|
Name of Client : Cuu Long Corporation for Investment, Development and Project Management of Infrastructure (funded by EDCF) |
Total No. of person-months of the assignment : 95.8 MM |
|
Address : 127B Dinh Tien Hoang Street, Ward3, Binh Thanh District, Ho Chi Minh City, Vietnam |
Approx. value of the services provided by your firm under the contract:
US$1,444,897 |
|
Start date (month/year) : Jan. 2009
Completion date (month/year) :Jan. 2010 |
No. of professional person-months provided by the joint venture partners or the Sub-Consultants: 56.1 MM |
|
Name of joint venture partner or sub-consultants, if any :
Pyunghwa Engineering Consultants Ltd. |
Name of senior regular full-time employees of your firm involved and functions performed(indicate most significant profiles such as Project Director/Coordinator, Team Leader) :
· Geotechnical Engineer : Mr. Woon Hyoung KIM
· Environmental Engineer : Mr. Seok MA
· Cost Estimate Expert : Mr. Pan Dong KWAK |
|
Narrative description of Project:
The GMS Southern Coastal Corridor is a road corridor running along the Gulf of Thailand coast from Bangkok in the north through Thailand, Cambodia and Viet Nam to Ca Mau City in the south of Viet Nam. This project is one of the sub-projects under SCCP financed by EDCF.
· Location: Rach Gia City, Kien Giang
· Road: L=20.83 km, W=12.0m
· Design Speed: 80 km/h
· Bridges: 22 EA, 3,234m (BR 20 ea, C-F Connector 2 ea)
· Other road facilities: Drainage System, City Road Safety facilities (street lights, guard rails etc.) |
|
Description of actual services provided in the assignment :
· Carry out necessary soil investigations along the road and bridge alignments, and collect samples for laboratory testing
· Study the existing surface hydrological and hydro-geological regimes, based on the analyses of rainfall and flood records, etc.
· Carry out road safety audits on the proposed roads and incorporate approved recommendations on any diversion, bypasses, intersection improvements and realignments and widening and other facilities to eliminate hazards
· Coordinate with national detailed design consultants to ensure the design quality
· Develop updated unit rates of construction for roads, bridges and culverts, including taxes and customs duties, taking into account the bid and completion costs of similar works recently undertaken in Viet Nam
· Prepare detailed engineering designs and bill of quantities, and calculate detailed cost estimates for civil works including taxes and customs duties
· Prepare contract packages for competitive bidding following the EDCF guidelines and procedures
· Assist Client to prepare, in accordance with the EDCF’s Guidelines and Procedures on Procurement of Civil Work Contracts, the final bid documents for the contract packages
· Assist Client to evaluate the bids submitted by interested bidders
· Ensure that the bid documents include specific provisions to minimize disruption/damage to the environment and local resettlements due to construction, using the EIA and the findings during this work as a basis for these provision
· Provide advices and on-the-job trainings to Client’s staff in contract administration
· Prepare and submit the inception report, progress report, detailed quarterly progress reports, draft final engineering designs and bid documents, final engineering designs and bid documents, evaluation of bidding documents, and project completion report |
Firm’s Name: Dasan Consultants Co., Ltd.
Sheet No.4
|
Assignment name :
Detailed Design for GMS-Southern Coastal Corridor Project (Minh Luong – Thu Bay Section) |
Approx. value of the contract (in current US$ or Euro) :
US$2,004,601
(\2,219,093,014, $1=\1,107, the official selling rate by the Korea Exchange Bank on 10/31/2011) |
|
Country : Vietnam
Location within country : Kien Giang Province |
Duration of assignment (months):
9 months |
|
Name of Client : Cuu Long Corporation for Investment, Development and Project Management of Infrastructure (funded by EDCF) |
Total No. of person-months of the assignment : 52 MM |
|
Address : 127B Dinh Tien Hoang Street, Ward3, Binh Thanh District, Ho Chi Minh City, Vietnam |
Approx. value of the services provided by your firm under the contract:
US$1,022,346 |
|
Start date (month/year) : Jan. 2009
Completion date (month/year) : Sep. 2009 |
No. of professional person-months provided by the joint venture partners or the Sub-Consultants: 25.4 MM |
|
Name of joint venture partner or sub-consultants, if any :
Dohwa Engineering Co., Ltd. |
Name of senior regular full-time employees of your firm involved and functions performed(indicate most significant profiles such as Project Director/Coordinator, Team Leader) :
· Project Manager : Mr. Kwang Hyun PARK
· Bridge Engineer : Mr. Yoon Hwan SONG
· Highway Engineer : Mr. Se Ouk OH |
|
Narrative description of Project:
The GMS Southern Coastal Corridor is a road corridor running along the Gulf of Thailand coast from Bangkok in the north through Thailand, Cambodia and Viet Nam to Ca Mau City in the south of Viet Nam. This project is one of the sub-projects under SCCP financed by EDCF.
· Location: Rach Gia City, Kien Giang
· Road: L=22.8 km, Width W=13m
· Design Speed: 60~80 km/h
· Bridges: 12 EA, 1,907m (Long Bridge 2ea, Medium Bridge 10ea) |
|
Description of actual services provided in the assignment :
· Carry out necessary soil investigations along the road and bridge alignments, and collect samples for laboratory testing
· Study the existing surface hydrological and hydro-geological regimes, based on the analyses of rainfall and flood records, etc.
· Carry out road safety audits on the proposed roads and incorporate approved recommendations on any diversion, bypasses, intersection improvements and realignments and widening and other facilities to eliminate hazards
· Coordinate with national detailed design consultants to ensure the design quality
· Develop updated unit rates of construction for roads, bridges and culverts, including taxes and customs duties, taking into account the bid and completion costs of similar works recently undertaken in Viet Nam
· Prepare detailed engineering designs and bill of quantities, and calculate detailed cost estimates for civil works including taxes and customs duties
· Prepare contract packages for competitive bidding following the EDCF guidelines and procedures
· Assist Client to prepare, in accordance with the EDCF’s Guidelines and Procedures on Procurement of Civil Work Contracts, the final bid documents for the contract packages
· Ensure that the bid documents include specific provisions to minimize disruption/damage to the environment and local resettlements due to construction, using the EIA and the findings during this work as a basis for these provision
· Provide advices and on-the-job trainings to Client’s staff in contract administration
· Prepare and submit the inception report, progress report, detailed quarterly progress reports, draft final engineering designs and bid documents, final engineering designs and bid documents, evaluation of bidding documents, and project completion report |
Firm’s Name: Dasan Consultants Co., Ltd.
Sheet No. 5
Assignment name:
Consulting Service for the Detailed Engineering Design, Construction Supervision and Post Construction Supervision for the Construction of Bacolod-Silay Airport Access Road Project |
Approx. values of the contract:
US$ 1,022,533 |
|
Country: Philippines
Location within country: Bacolod |
Duration of assignment (months):
26 months |
|
Name of Client:
Department of Public Works and Highways(DPWH) |
Total No of person-months of the assignment:
65 M/M |
|
Address:
2nd Street, Port Area, Manila, Philippines
|
Approx. value of the services provided by your firm under the contract:
US$ 1,022,533 |
|
Start date (month/year): November 2010
Completion date (month/year): October 2012 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: None |
|
Name of joint venture partner or sub-Consultants, if any:
None |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. You, Yong Gwon |
|
Narrative description of Project:
The Government of the Philippines thru the Department of Public Works and Highways (DPWH) has applied for financial assistance from the Korean Economic Development Cooperation Fund (KEDCF). The project shall be implemented by DPWH:
· Total Length: L=10.12km, B=12.5m (2 lanes)
· V=80km/hr
· Bridge: 6 locations (L=317m)
· Intersections: 7 locations |
|
Description of actual services provided by your staff within the assignment :
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Provide a advices and on-the-job trainings to Client’s staff
· Assist the client with bidding preparation, evaluation, and contracting process
· Review the basic design for the urban road developing and conducting survey, review and updating the feasibility study
Design work including general survey, geometric design, road drainage design, bridge design, appurtenant works, environmental impact assessment (EIA), cultural resource investigation, noise & vibration resistance design, construction cost estimation and traffic impact assessment;
· Monitor the implementation of the environmental management plan, executing approval of working drawings prepared and submitted by contractors, the setting out of the works and provision of instructions to the contractor, under client’s approval on progress report and other required reports
· Approve the payment of the completed work related and issue all claims of payment including variation order submitted by the Contractor to get approval from Client
· Prepare the bidding documents and assist the client to evaluate the bid documents and prepare bid evaluation reports |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 6
|
Assignment name:
Detailed Design and Construction Supervision for the Jagul Mountain Beltway Construction |
Approx. values of the contract:
Design: US$472,231
Construction Supervision: US$ 2,139,114 |
|
Country: Korea
Location within country: South Gyeongsang Prov. |
Duration of assignment (months):
13 months (Design) / 93 months (C/S) |
|
Name of Client:
South Gyeongsang Provincial Government |
Total No of person-months of the assignment: 495M/M |
|
Address:
300 Jungang-daero, Uichang-gu, changwon-si, Gyeongsangnam-do 641-702, Korea |
Approx. value of the services provided by your firm under the contract :
Design: US$283,338 , C/S: US$855,645 |
|
Start date (month/year):
· June 1998 (Design), June 2000 (C/S)
Completion date (month/year):
· July 1999 (Design) , March 2008 (C/S) |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: 271 M/M |
|
Name of joint venture partner or sub-Consultants, if any:
· Wonbang (40%, Design), Wonbang / Hanmaek (60%, C/S) |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Cho, Wan-sang |
|
Narrative description of Project:
Total Length of Road: 13.3km.
◎ Section 1
· Trimming ground soil: 367,9767m3, Building ground soil: 369,868m3, Small bridges: 50m/7 bridges,
· Drain Holes: Rock Mass(BOX): 400m/15 locations
· Drain Hole Pipes: 1,850m , Steel Covered Retaining Wall: 61,531 m3,
· Surface Layer: 1,089a Annex hole 1 set, Parking lot 1 set
◎ Section 2
· Trimming ground soil: 64,733m3, Banking ground soil 179,758m3
· Small bridges: 90m/4 bridges, Drain Holes: Rock Mass(BOX): 529.4m/1 location
· Drain Hole Pipes: 1,642m / 99 locations,
· Pavement: Base Layer 1,284s, Surface Layer: 1,284a, Annex hole 1 |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Provide a advices and on-the-job trainings to Client’s staff
Approve the payment of the completed work related and issue all claims of payment including variation order submitted by the Contractor to get approval from Client
Design work including general survey, geometric design, road drainage design, bridge design, appurtenant works, environmental impact assessment (EIA), cultural resource investigation, noise & vibration resistance design, construction cost estimation and traffic impact assessment;
· Implement overall project management of construction supervision and coordination with the client and the implementation agency
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 7
|
Assignment name:
Detailed Design and Construction Supervision for Road Construction between Jeongub and Wanju (Section 1) |
Approx. values of the contract:
Design: US$2,450,587
Construction Supervision(C/S): US$2,123,061 |
|
Country: Korea
Location within country: Jeongub and Wanju City |
Duration of assignment (months):
29 months (Design) / 79 months (C/S) |
|
Name of Client:
North Jeolla Provincial Government (Construction Supervision) |
Total No of person-months of the assignment: 557M/M |
|
Address:
225 Hyoja ro, Wansan gu, Jeonju City, Jeollabuk do, Korea |
Approx. value of the services provided by your firm under the contract:
Design: US$1,225,293
C/S : US$1,167,683 |
|
Start date (month/year):
· Design: June 2000
· C/S: January 2003
Completion date (month/year):
· Design: November 2002
· C/S: June 2011 |
No. of professional person-months provided by the joint venture partners or the Sub-Consultants: 272 M/M |
|
Name of joint venture partner or sub-Consultants, if any:
· Sooseong (50%, Design)
· Hudigm and Seodo (50%, C/S) |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Kim, Hong Ju |
|
Narrative description of Project:
The purpose of this service is to improve accessibility which is relatively under developed rural area. The stretch of the project road was 8.82km long and design speed was 70km/hr. There are 7 short-span and 7 long-span bridges and 1 bi-directional tunnel.
· Road Length: L=8.63km, B=10.5m
(2 lanes/L=4.35km~4 lanes/L=4.1km)
· Bridge: 960m / 7 bridges |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Provide a advices and on-the-job trainings to Client’s staff
Approve the payment of the completed work related and issue all claims of payment including variation order submitted by the Contractor to get approval from Client
· Confirm existing road condition survey
· Overall project management and coordination with the client and the implementation agency
· Prepare monitoring of the status of the environmental compliance and implementation of environmental management plans as well as the implementation of traffic management plans
· Prepare and submit the inception report, progress report, detailed quarterly progress reports, draft final engineering designs and bid documents, final engineering designs and bid documents, evaluation of bidding documents, and project completion report
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 8
Assignment name:
Detailed Design and Construction Supervision for Construction of Regional Road between Ilro and Imseong |
Approx. values of the contract:
Design: US$559,891
Construction Supervision : US$1,849,132 |
|
Country: Korea
Location within country: Ilro~Imseong, South Jeolla Province |
Duration of assignment (months):
16 months (Design) / 60 months (C/S) |
|
Name of Client:
South Jeolla Provincial Government |
Total No of person-months of the assignment:
188 M/M |
|
Address:
1 Oryong-gil, Samhyang-eup, Muan-gun Jeollanam-do, Korea |
Approx. value of the services provided by your firm under the contract : :
Design: US$279,945, C/S : US$924,566 |
|
Start date (month/year): June 2000
· Design: June 2000, C/S : December 2004
Completion date (month/year):
· Design: October 2001, C/S : December 2011 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: 94 M/M |
|
Name of joint venture partner or sub-Consultants, if any:
· KCI (50%, Design)
· KCI (50%, Construction Supervision) |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Lee, Yong Jae |
|
Narrative description of Project:
Completion of the improvement of Regional Road No. 820 was expected to increase the accessibility to Mooan International Airport in Mokpo-Mooan region. This 4-laning road has 12 intersections and 3 bridges. Consideration for the treatment of soft ground was applied.
· Total Length: L=7.3km, Design speed: V=70km/hr and Width of road: B=19.5m
· Soft ground treatment: 69,255 m2
· Bridge : 3locations (Total length: 135m)
· Review of Environment Impact Assessment: 1 L/S |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Confirm the existing road condition and review of surveying report
· Implement overall project management and coordination with the client and the implementation agency
· Detailed design work including general survey, geometric design, road drainage design, bridge design, appurtenant works, environmental impact assessment (EIA), cultural resource investigation, noise & vibration resistance design, construction cost estimation and traffic impact assessment.
· Carry out management of the entire contract administration works such as assessment of adequacy of contractor’s inputs, equipment, quality control plan, mobilization and organization plan, schedule risk management, and environment plans
· Implement monitoring of the status of the environmental compliance and implementation of environmental management plans as well as the implementation of traffic management plans
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 9
Assignment name:
Detailed Design for Road Improvement between Sosa and Noksan |
Approx. values of the contract:
US$ 2,707,768
|
|
Country: Korea
Location within country: Busan Metropolitan City |
Duration of assignment (months):
8 months |
|
Name of Client:
Ssang Yong Engineering Construction Co., Ltd. |
Total No of person-months of the assignment:
582 M/M |
|
Address:
7-23 Shinchon-dong, Songpa-gu, Seoul, Korea |
Approx. value of the services provided by your firm under the contract :
US$1,316,770 |
|
Start date (month/year): January 2005
Completion date (month/year): July 2006 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: 299 M/M |
|
Name of joint venture partner or sub-Consultants, if any:
· Nawoo: 36 %
· Hanseong: 15% |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Cho, Wan Sang |
|
Narrative description of Project:
· Total Length: L=6.81km, B=20.0 (4 lanes)
· Main road (V=80km/h), connector road (V=30~40km/h)
· Function of road: Alternative route to National Road No.2
· Bridge: Long-span bridge: 3 bridges/657.5m, Short-span bridge: 5 bridges/162.5m
· Tunnel: 3 locations/3,240m
· Intersections: 3 locations (interchanges: 2 locations, crossing: 1 location)
· Disaster impact assessment
· Environment impact assessment |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Provide a advices and on-the-job trainings to Client’s staff
· Verify the scope of work and confirm road conditions
· Review of the existing material and geotechnical investigation
· Detailed design work including general survey, geometric design, road drainage design, bridge design, appurtenant works, environmental impact assessment (EIA), cultural resource investigation, noise & vibration resistance design, construction cost estimation and traffic impact assessment.
· Design works & plan of construction regulations such as notice of designated field engineers and documentary evidence, progress schedule, management plans of quality, safety, harms, risk and environment.
· Confirm compliance assessments in accordance with entire progress schedule by a method of weekly and monthly major progress.
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports
· Carry out budget estimation: Estimate total construction cost, contract price, material cost, and taxes based on the government-set official price. |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 10
Assignment name:
Construction Supervision of Road Improvement between Deokpo and Yeonha |
Approx. values of the contract :
US$5,408,491
|
|
Country: Korea
Location within country: Gangwon Province |
Duration of assignment (months):
63 months |
|
Name of Client:
Wonju Regional Construction and Management Administration |
Total No of person-months of the assignment:
370 M/M |
|
Address:
2236 Bukwon ro, Wonju City, Gangwon Province Korea |
Approx. value of the services provided by your firm under the contract :
US$5,408,491 |
|
Start date (month/year): September 2002
Completion date (month/year): December 2007 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: None |
|
Name of joint venture partner or sub-Consultants, if any:
None |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Kim, Sang Jin |
|
Narrative description of Project:
◎ Project location (Section 1): Deokpo ~ Yeonha
· Road construction: L=6.5km, B=20.0m (4 lanes)
· Design speed: 80km/hr
· Bridge: 8 locations (L=1,588m, Steel Bridge: 6 locations)
◎ Project location (Section 2): Yeonha ~ Shindong
· Road construction: L=6.5km, B=20.0m (4 lanes), Design speed: 80 km/h
· Bridge: 6 locations (L=930m, P.S.C Box Girder) |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Provide a advices and on-the-job trainings to Client’s staff
· Confirm the existing road condition survey: pavement, shoulder, drainage facilities, drainage facilities, slopes
· Carry out contract management of the entire contract administration works such as assessment of adequacy of contractor’s inputs, equipment, quality control plan, mobilization and organization plan, schedule risk management, and environment plans
· Approve the payment of the completed work related and issue all claims of payment including variation order submitted by the Contractor to get approval from Client
· Conduct confirmation and assessment of the status of the project progress through weekly and monthly progress monitoring and evaluation of changes in plans and specifications during construction;
· Check the quantities of the remaining work activities and monitoring of the project cost
· Confirm the approved and accepted works quantities and materials, and approve and certify interim and final payments of contractors |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 11
Assignment name:
Construction Supervision for Road Expansion & Maintenance Works between Guseongpo and Doochon |
Approx. values of the contract :
US$5,289,855
|
|
Country: Korea
Location within country: Wonju City |
Duration of assignment (months):
84 months |
|
Name of Client:
Wonju Construction and Management Administration |
Total No of person-months of the assignment:
514 M/M |
|
Address:
283, Dangye-ro, Wonju City, Gangwon Province, Korea |
Approx. value of the services provided by your firm under the contract :
US$5,289,855 |
|
Start date (month/year): December 2000
Completion date (month/year): December 2007 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: None |
|
Name of joint venture partner or sub-Consultants, if any:
None |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Kim, Pan Sik |
|
Narrative description of Project:
◎ Guseongpo to Doochon
Total Length: L=10.66km (Design speed= 80km/hr), B=20.0m (4 lanes)
Bridge: 7 locations (L=475m)
Steel bridges: 2 locations (L=330.0m, Yachi-Dachun bridge: L=210.0m, B=20.9m)
Tunnel: 1 location (L=664m), B=9.6 (2 lanes)
◎ Doochon to Euhron
Total Length: L=10.60km, B=20.0m (4 lanes)
Design speed=80km/hr
Bridge: 11 locations (L=1,136m)
Steel bridges: 2 locations (L=510.0m, Jangnam Bridge: L=280.0m, B=20.9m) |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Provide a advices and on-the-job trainings to Client’s staff
· Implement overall project management of construction supervision
· Confirm compliance assessments in accordance with entire progress schedule, and advising changes in plans and specifications during construction;
· Manage the quantities of approved and accepted works and materials and approving and certifying interim and final payment of contractors;
· Coordinate with the Client and implementing agency regarding the roadway aspects and other issues and concerns of the project.
· Approve the payment of the completed work related and issue all claims of payment including variation order submitted by the Contractor to get approval from Client
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 12
Assignment name:
Construction Supervision for Road Construction Along Tancheon Road between Taepyeong and Bokjeong-dong |
Approx. values of the contract :
US$1,013,550
|
|
Country: Korea
Location within country: Gyeonggi Province |
Duration of assignment (months):
42 months |
|
Name of Client:
Seongnam City Government |
Total No of person-months of the assignment:
89 M/M |
|
Address:
Seongnam City, 10 Cheongbakri Road, Soojeong-gu, Seongnam City, Gyeonggi Province, Korea |
Approx. value of the services provided by your firm under the contract :
US$1,013,550 |
|
Start date (month/year): March 2005
Completion date (month/year): August 2008 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: None |
|
Name of joint venture partner or sub-Consultants, if any:
None |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Kim, Sang Jin |
|
Narrative description of Project:
· Total Length : L=2.59km, Width(B)=20m
· Earth work: Excavation & cutting quantity: 428,982m3, Embankment quantity: 121,862 m3
· Drainage work
Culvert: 40m/2 locations, Stormwater sewer: L =4,283m (D=600mm~1,200mm)
· Bridge
Taepyeong Bridge: L=6m / Construction method: RC RAHMEN
Tancheon Bridge: L=65m / Construction method: RC RAHMEN
Concrete reinforcement retaining wall (Block type): L=1,599m/8,339m2, Height(H)= 4.1~10.5m
Pavement and other works |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Provide a advices and on-the-job trainings to Client’s staff
· Confirm the scope of work and review of detailed design
· Conduct overall project management of construction supervision
· Confirm compliance assessments in accordance with entire progress schedule, and advising changes in plans and specifications during construction
· Approve the payment of the completed work related and issue all claims of payment including variation order submitted by the Contractor to get approval from Client
· Coordinate with the Client and implementing agency regarding the roadway aspects and other issues and concerns of the project.
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 13
Assignment name:
Construction Supervision for Road Construction between Sojung and Baebang in Cheonan |
Approx. values of the contract :
US$4,388,437
|
|
Country: Korea
Location within country: Cheonan City |
Duration of assignment (months):
93 months |
|
Name of Client:
Daejeon Regional Construction & Management Administration |
Total No of person-months of the assignment:
281 M/M |
|
Address:
599 Gaejok Road, Dong Gu, Daejeon Metropolitan City, Korea |
Approx. value of the services provided by your firm under the contract :
US $4,388,437 |
|
Start date (month/year): August 2002
Completion date (month/year): December 2011 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: None |
|
Name of joint venture partner or sub-Consultants, if any:
None |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Han, Man Woo |
|
Narrative description of Project:
Road Construction : L = 11.38km
New construction: L = 8.90km ,B = 20.0m (4 lanes)
Widening construction: L = 2.48km (B = 18.5m → 25.5m, 4 lanes → 6 lanes)
Bridges : 16 locations (L=1,167m)
St. Box Girder : 2 locations (L=390m)
Gasong 1st Bridge: L = 50m, B = 20.9m, Span length: L=50m
Pungseochon Bridge: B =20.9m, B = 20.9m, Span length: L=50m
R.C Slab : 2 locations (L=144m) & IPC Girder : 4 locations (L=190m)
PSC Beam : 5 locations (L=405m) & R.C Rahmen : 3 locations (L=38m) |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Provide a advices and on-the-job trainings to Client’s staff
· Confirmation of work scope and review of detailed design
· Provide management system of the entire contract administration works such as assessment of adequacy of contractor’s inputs, equipment, quality control plan, mobilization and organization plan, schedule and risk management, and environment plan
· Conduct capability development and providing on-the-job-training to local officials/ engineers/ staff
· Approve the payment of the completed work related and issue all claims of payment including variation order submitted by the Contractor to get approval from Client
· Monitor the status of the environmental compliance and implementation of environmental management plans as well as the implementation of traffic management plans
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 14
Assignment name:
Construction Supervision for Road Construction between Bukmyeon and Wondeok |
Approx. values of the contract :
US$ 3,700,632
|
|
Country: Korea
Location within country: Wonju City |
Duration of assignment (months):
95 months |
|
Name of Client:
Boryeong City Government |
Total No of person-months of the assignment:
239 M/M |
|
Address:
269-4 Boryeong City, South Chungchung Province, Korea |
Approx. value of the services provided by your firm under the contract :
US$ 3,700,632 |
|
Start date (month/year): November 2003
Completion date (month/year): December 2009 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: None |
|
Name of joint venture partner or sub-Consultants, if any:
None |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Park, Ok Hyeon |
|
Narrative description of Project:
Total Length : L = 9.7km, B = 20.0m (4 lanes)
Design speed: V=80km/ hr
Bridges: 11locations (L=1,314m)
Yaksoo 1st Bridge : L = 180m, B = 20.9m(2 lanes), Span length: L=6@30 = 180m, Bridge type: P.S.C BEAM
Yaksoo 2nd Bridge : L = 230m, B = 20.9m, Span length: L =50 + 60 + 60+ 60 = 230m(up line), L= 60+60+60+50 = 230m (down line) , Type of Bridge : S.T BOX
Imwonchun Bridge: L = 300m, B = 20.9m (2 lanes)
Pavement works
Concrete surface layer: 35,602m2, Asphalt surface layer: 627a (Main line) |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan, Resettlement Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Provide a advices and on-the-job trainings to Client’s staff
· Confirmation of work scope and review of detailed design
· Conduct overall management of construction supervision
· Approve the payment of the completed work related and issue all claims of payment including variation order submitted by the Contractor to get approval from Client
· Coordinate with the Client and implementing agency regarding the roadway aspects and other issues and concerns of the project
· Monitor the status of the environmental compliance and implementation of environmental management plans as well as the implementation of traffic management plans
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 15
Assignment name:
Construction Supervision of National Road No. 98 Improvement from Unsu to Daeseong |
Approx. values of the contract:
US$1,217,317
|
|
Country: Korea
Location within country: Namyangju City |
Duration of assignment (months):
60 months |
|
Name of Client:
Namyangju City Government |
Total No of person-months of the assignment:
79 M/M |
|
Address:
185-10 Geumgok-dong, Namyangju City, Gyeonggi Province |
Approx. value of the services provided by your firm under the contract :
US$1,217,317 |
|
Start date (month/year): November 2003
Completion date (month/year): November 2008 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: None |
|
Name of joint venture partner or sub-Consultants, if any:
None |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader :Mr. Lee, Yoon Sik |
|
Narrative description of Project:
· Total Length: L=2.34km, B=10m (3 lanes), Bridge: L=480m/2 bridges
· Unsu bridge: L=270m/B=13.35m (3 lanes) and 9 span: (3@30)x3=270m
Direct foundation: 8 bridge pile, 2 bridge abutments
Construction Method: PSC Beam
· Unsu 1 bridge: L=210m/B=13.35m (3 lanes)
7 span: 2@30+3@30+2@30+2@30=210m
Direct foundation: 2 bridge pile
Steel pipe pile foundation: 4 bridge pile, 2 bridge abutments
Construction Method: PSC Beam
· Structural work: Reinforcement retaining wall (533m2), T-type retaining wall (70m)
· Pavement plan: 266a (surface layer) |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Provide a advices and on-the-job trainings to Client’s staff
· Confirmation of work scope and review of detailed design and conduct overall management of construction supervision
· Implement updated resettlement plan and Korean safeguard policy statement and assist in the preparation of corrective action plans
· Approve the payment of the completed work related and issue all claims of payment including variation order submitted by the Contractor to get approval from Client
· Coordinate with the Client and implementing agency regarding the roadway aspects and other issues and concerns of the project
· Monitor the status of the environmental compliance and implementation of environmental management plans as well as the implementation of traffic management plans
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No. 16
Assignment name:
Construction Supervision for Road Construction between Sengkuk and Janhowon |
Approx. values of the contract :
US$2,651,309
|
|
Country: Korea
Location within country: North Chungcheong Prov. |
Duration of assignment (months):
74 months |
|
Name of Client:
Daejeon Regional Construction and Management Administration |
Total No of person-months of the assignment:
257M/M |
|
Address:
599 Gaejokro, Dong-gu, Daejeon, Korea |
Approx. value of the services provided by your firm under the contract :
US$ 2,651,309 |
|
Start date (month/year): October 1996
Completion date (month/year): December 2002 |
No of professional person-months provided by the joint venture partners or the Sub-Consultants: None |
|
Name of joint venture partner or sub-Consultants, if any:
None |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Park, Man Hwa |
|
Narrative description of Project:
Total Length: L=10.12km, B=18.50m
Civil Works:
Cutting: 580,867m3, Embankment: 1,627,864m3, Slope protection work: 274,130 m2
Bridge: 13 locations (L=613m)
Steel Box Girder: 4 locations (L=425m), Max. span length: L=55m
R.C Slab : 1 location (L=59m), R.C Rahmen : 8 locations (L=129m)
Pavement Works: Base layer : 2,213a (1a=100m2), Surface layer : 2,333a (1a=100m2) |
|
Description of actual services provided in the assignment:
· Assist the client in contract administration
· Provide the organization for the project and implement and financial analysis
· Establish and update implementation of the Environmental Management Plan and social management plan
· Provide the clients with all kinds of records and documents
· Conduct overall project management of construction supervision
· Provide a advices and on-the-job trainings to Client’s staff
· Provide management of the entire contract administration works such as assessment of adequacy of contractor’s inputs, equipment, quality control plan, mobilization and organization plan, schedule and risk management, and environment plan
· Approve the payment of the completed work related and issue all claims of payment including variation order submitted by the Contractor to get approval from Client
· Implement updated resettlement plan and Korean safeguard policy statement and assist in the preparation of corrective action plans
· Check the remaining quantities and monitoring of the project cost
· Prepare engineering reports and records of construction events to properly document the project
· Monitor the status of the environmental compliance and implementation of environmental management plans as well as the implementation of traffic management plans
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports |
Firm’s Name: Kunhwa Consulting & Engineering Co., Ltd.
Sheet No.17
|
Assignment name:
Construction Supervision for Gaya – Masan Rural Road Expansion and Pavement Project |
Approx. value of the contract (in current US$ or Euro) :
US$3,237,850
(\ 3,584,300,000, $1=\1,107, the official selling rate by the Korea Exchange Bank on 10/31/2011) |
|
Country: Republic of Korea
Location within country : Gyeongsangnam-do, Korea |
Duration of assignment (months):
146 months |
|
Name of Client: Gyeongsangnam Regional Government |
Total No. of person-months of the assignment :
298 MM |
|
Address : 300, Sarim-dong, Euichang-gu, Changwon-si, Gyeongsangnam-do, Korea |
Approx. value of the services provided by your firm under the contract:
US$3,237,850 |
|
Start date (month/year) : Jan. 1996
Completion date (month/year) : Jan. 2008 |
No. of professional person-months provided by the joint venture partners or the Sub-Consultants: N/A |
|
Name of joint venture partner or sub-consultants, if any :
N/A |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader : Mr. Soon Kyu JUNG |
|
Narrative description of Project:
· Road Length : 9.973km
· Road Width : 18.5m
· 8 Bridges/975m (Steel Box Girder, P.C Beam Type)
· 1 Tunnel/100m (NATM Type) |
|
Description of actual services provided in the assignment :
· Review the project scope, detailed design, and client’s requirements
· Prepare a composite procurement plan setting out details of proposed contract packages, procurement methods, and proposed schedule for procurement
· Review the bidding documents and assist the client to evaluate the bid documents
· Assist the client with financial management such as procurement of labor, materials and equipment
· Assist the client in the preparation of realistic construction schedules showing anticipated progress of works and expenditures for the contract packages
· Implement updated resettlement plan and assist in the preparation of corrective action plans
· Prepare and issue reports as defined subsequently and maintain records, correspondence and diaries
· Process the contractor’s possible claims
· Provide the clients with complete records and the component completion report
· Provide advices and on-job-trainings to the client in contract administration
· Monitor implementation of the Environmental Management Plan |
Firm’s Name: Dasan Consultants Co., Ltd.
Sheet No.18
|
Assignment name:
Construction Supervision for Access Road Construction Project between Sabuk and Wongu |
Approx. value of the contract (in current US$ or Euro) :
US$1,753,388
(\1,941,000,000, $1=\1,107, the official selling rate by the Korea Exchange Bank on 10/31/2011) |
|
Country: Republic of Korea
Location within country : Jeongseon-gun, Gangwon-do, Korea |
Duration of assignment (months):
61 months |
|
Name of Client: Gangwon Land |
Total No. of person-months of the assignment :
161MM |
|
Address : Gohan-ri, 1-139, Gohan-eup, Jeongseon-gun, Gangwon-do, Korea |
Approx. value of the services provided by your firm under the contract:
US$1,022,809 |
|
Start date (month/year) : Sep. 1999
Completion date (month/year) :Sep. 2004 |
No. of professional person-months provided by the joint venture partners or the Sub-Consultants: 48MM |
|
Name of joint venture partner or sub-consultants, if any :
Daeho Engineering & Construction |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Byung Sik YOO |
|
Narrative description of Project:
This project scopes are composed of constructing road with 2.81km and 1bridge with 92.552m. The width of road is 11.0m ~ 19.5m. Bridge is constructed Steel Box Girder Bridge type.
· Site length : 2.81km
· The width : 11.0m ~ 19.5m
· Bridge length : 92.552m
· Bridge width : 21.7m (Steel Box Girder Bridge) |
|
Description of actual services provided in the assignment :
· Review the project scope, detailed design, and client’s requirements
· Prepare a composite procurement plan setting out details of proposed contract packages, procurement methods, and proposed schedule for procurement
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports
· Assist the client in contract administration and project implementation
· Assist the client with financial management such as procurement of labor, materials and equipment
· Assist the client in the preparation of realistic construction schedules showing anticipated progress of works and expenditures for the contract packages
· Assist and provide guidance to the client during the construction activities
· Implement updated resettlement plan and Korean safeguard policy statement and assist in the preparation of corrective action plans
· Prepare and issue reports as defined subsequently and maintain records, correspondence and diaries
· Process the contractor’s possible claims
· Provide the clients with complete records and the component completion report
· Provide advices and on-job-trainings to the client in contract administration
· Monitor implementation of the Environmental Management Plan
· Prepare environmental assessment report in compliance with Korean standard |
Firm’s Name: Dasan Consultants Co., Ltd.
Sheet No.19
|
Assignment name :
Construction Supervision for Rural Road Construction Project between Gijachon and Bukhansan-ro |
Approx. value of the contract (in current US$ or Euro) :
US$899,277
(\995,500,000, $1=\1,107, the official selling rate by the Korea Exchange Bank on 10/31/2011) |
|
Country : Republic of Korea
Location within country : Eunpyeong-gu, Seoul, Korea |
Duration of assignment (months):
32 months |
|
Name of Client : Eunpyeong Regional Government |
Total No. of person-months of the assignment :
82 MM |
|
Address : 84, Nokbun-dong, Eunpyeong-gu, Seoul, Korea |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro):
US$899,277 |
|
Start date (month/year) : Dec. 2002
Completion date (month/year) : Jul. 2005 |
No. of professional person-months provided by the joint venture partners or the Sub-Consultants: N/A |
|
Name of joint venture partner or sub-consultants, if any :
N/A |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Sun Kyu CHUNG |
|
Narrative description of Project:
This rural road, connects between Jingwanoe-dong and Jingwannae-dong, was constructed 3 bridges, 2 retaining walls, and 1 soundproof wall. We expect to secure Tongil-ro Bypass, and to reduce the traffic congestion concourse of three streets in Gupabal.
· Road Length : 2.553km, Width : 25.0m with 4lanes
· 3 Bridges : L = 108m
· Retaining wall (Z-typed, Reverse T-Typed) : 715m
· Asphalt Concrete Pavement :52,918m2
· Concrete Pavement : 9,055 m2
· Lay Water Pipes : 1,245 m2 |
|
Description of actual services provided in the assignment :
· Review the project scope, detailed design, and client’s requirements
· Prepare a composite procurement plan setting out details of proposed contract packages, procurement methods, and proposed schedule for procurement
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports
· Assist the client in contract administration and project implementation
· Assist the client with financial management such as procurement of labor, materials and equipment
· Assist the client in the preparation of realistic construction schedules showing anticipated progress of works and expenditures for the contract packages
· Implement updated resettlement plan and Korean safeguard policy statement and assist in the preparation of corrective action plans
· Prepare and issue reports as defined subsequently and maintain records, correspondence and diaries
· Process the contractor’s possible claims
· Provide the clients with complete records and the component completion report
· Provide advices and on-job-trainings to the client in contract administration
· Monitor implementation of the Environmental Management Plan
· Prepare environmental assessment report in compliance with Korean standard |
Firm’s Name: Dasan Consultants Co., Ltd.
Sheet No.20
|
Assignment name :
Construction Supervision for 2002 Rural Road Expansion and Pavement Project |
Approx. value of the contract (in current US$ or Euro) :
US$719,061
(\796,000,000, $1=\1,107, the official selling rate by the Korea Exchange Bank on 10/31/2011) |
|
Country : Republic of Korea
Location within country : Gyeonggi, Korea |
Duration of assignment (months):
40 months |
|
Name of Client : Yeojugun County Office |
Total No. of person-months of the assignment :
66 MM |
|
Address : 4, Hongmun-ri, Yeoju-eup, Yeoju-gun, Gyeonggi-do, Korea |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro):
US$719,061 |
|
Start date (month/year) : Apr. 2003
Completion date (month/year) : Jul. 2006 |
No. of professional person-months provided by the joint venture partners or the Sub-Consultants: N/A |
|
Name of joint venture partner or sub-consultants, if any :
N/A |
Name of senior regular full-time employees of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader):
Team Leader: Mr. Jun Chul LEE |
|
Narrative description of Project:
· Road expansion and pavement project between Sagok and Jangan
Site length : 2.76km, Width : 10.0m, Rigid-frame Bridge : L = 2@10=20m
· Noegok bridge reconstruction and approaching road expansion and pavement project
Site length : 1.08km, Width : 9.0m, E-beam Bridge : L=6@40=240m
· Bungnae bypass construction project
Site length : 3.04km, Width : 25.0m, L-typed retaining wall : 38m
· Ganam exercise park access road expansion and pavement project
Site length : 1.0km, Width : 14.0m |
|
Description of actual services provided in the assignment :
· Review the project scope, detailed design, and client’s requirements
· Prepare a composite procurement plan setting out details of proposed contract packages, procurement methods, and proposed schedule for procurement
· Review the bidding documents in accordance with Korean standard guidelines and assist the client to evaluate the bid documents and prepare bid evaluation reports
· Assist the client in contract administration and project implementation
· Assist the client with financial management such as procurement of labor, materials and equipment
· Assist the client in the preparation of realistic construction schedules showing anticipated progress of works and expenditures for the contract packages
· Assist and provide guidance to the client during the construction activities
· Implement updated resettlement plan and Korean safeguard policy statement and assist in the preparation of corrective action plans
· Prepare and issue reports as defined subsequently and maintain records, correspondence and diaries
· Process the contractor’s possible claims
· Provide the clients with complete records and the component completion report
· Provide advices and on-job-trainings to the client in contract administration
· Monitor implementation of the Environmental Management Plan
· Prepare environmental assessment report in compliance with Korean |
Firm’s Name: Dasan Consultants Co., Ltd.